Clean rooms at the Head Office
- The Room 1
- 500 classes, 282 square meters, 5 meters above the floor
- The Room 2
- 500 classes, 282 square meters, 5 meters above the floor
- The Room 3
- 5,000 classes, 180 square meters, 5 meters above the floor
Clean rooms at the Chikatsu plant
- The Room 4
- 100 classes, 300 square meters, 2.7 meters above the floor

- The Room 5
- 500 classes, 900 square meters, 2.7 meters above the floor
Production Facilities
- Dicing saw system / Water purification systems
- Die Bonder / Wire Bonder
- Clean baking furnace / Vacuum furnace
- SMT line / Solder printer / Solder appearance printer
- Clean bench
- Laser marker / Laser dispenser
- Coating potting device
- Desk robot ... etc
Measuring instruments
- Digital Microscopes
- Spectacle Analyzers
- Digital Oscilloscopes
- Digital Millimeters
- Memory HiCorders
- Thermostatic Bath and Electrostatic Test Equipments